Replacement of Power Cables Rockaway Park Yard

Remove all existing traction power positive and negative feeders, jumper and equalizer cables, 3rd rail heater fuse boxes, 3rd rail heating

View Details

MTA-NYCT - Sandy Repair Project - Montague Tube Rehabilitation

After Hurricane Sandy, the MTA was able to restore service through the Montague Tunnel that permits “R” train service from

View Details

C-34906  - Upgrade of DC Power System at 207th Street Maintenance Shop

In April 2013, New York City Transit issued the notice of award to TC Electric for the upgrade of the

View Details

MTA-NYCT Rehabilitation of the Rockaway “A” Line due to Sandy

Following Hurricane Sandy in November of 2012, TC Electric repaired three different emergency jobs in the Rockaways: Rockaway Park Station/Train

View Details

Steinway Tube Duct Rehabilitation & CBH Construction

 

The work consists of the demolition of the existing concrete ductbanks in both Steinway Tubes (#7 line) under the East

View Details

MTA-NYCT Rehabilitation of the Culver Line Viaduct

The Culver Line viaduct, located between the portal of Carroll St. Station and the portal south of the Fourth Avenue

View Details

Signal System Modernization Lexington and 5th Avenue

The work performed consisted of the total signal system rehabilitation, track reconstruction and construction of signal room enclosures for the

View Details

Metro-North Railroad – Traction Power MOD’s

TC Electric furnished and installed materials, manufactured equipment, hardware and software to construct a fiber optic-based automation system for the

View Details

Signal System Reconfiguration, Track M Jerome Avenue

 New Signal System
 New Cable Support System
 New Traction power connections to the Third Rail
 Working alongside active rail

View Details